Project : Hydro – Batoka Gorge Hydropower Project

Countries/Region : Zimbabwe, Zambia | Southern Africa region

Project Location : Zambezi River Basin, between Victoria Falls and the Kariba Dam

Sector/Subsector : Energy/Generation

Project Description : A hydropower plant based in the Zambezi River Basin, with an installed capacity of 1,600 MW, to enable export of electricity.      

 

Project : Transmission-- North South Transmission Line Project

Countries/Region : Egypt, Sudan, South Sudan, Ethiopia, Kenya, Uganda, Tanzania, Malawi,Mozambique, Zambia, Zimbabwe, South Africa, | East and Southern Africa

Project Location : Regional Interconnector-East and Southern Africa

Sector/Subsector : Energy/Transmission

Project Description : Construction of an 8,000 km, 3,000 - 17,000 MW capacity transmission line system from Egypt through Sudan, South Sudan, Ethiopia, Kenya, Uganda, Tanzania, Malawi, Mozambique, Zambia, and Zimbabwe to South Africa, connecting the Eastern Africa Power Pool (EAPP) and the SAPP. 

Programme Reference
Country selection
oldmapid
1110
Key Results
Hydro – Batoka Gorge Hydropower Project is a plant based in the Zambezi River Basin, with an installed capacity of 1,600 MW, to enable exporting of electricity
Transmission - North South Transmission Line Project entails the construction of an 8,000 km, 3,000 - 17,000 MW capacity transmission line system from Egypt through Sudan, South Sudan, Ethiopia, Kenya, Uganda, Tanzania, Malawi, Mozambique, Zambia, and Zimbabwe to South Africa, connecting the Eastern Africa Power Pool (EAPP) and the Southern Africa Power Pool (SAPP)